AH25 Liquid Waterproofing

Hydrostop AH-25 Liquid Waterproofing Brochure

AH25 Liquid Waterproofing – Brochure

 

Product Literature

AH25 Liquid Waterproofing – installation guidelines
AH25 Liquid Waterproofing – datasheet

Certification

AH25 Liquid Waterproofing – BBA certificate
AH25 Liquid Waterproofing – fire test certificate

 

Standard Details

Warm roof concrete deck standard details

AH25-0C – warm roof build-up detail
AH25-1C – drip edge detail
AH25-2C – check kerb detail
AH25-3C – box gutter/change of level detail
AH25-4C – roof drain detail
AH25-5C – right angle rainwater outlet detail
AH25-6C – drip edge detail mansard junction
AH25-7C – parapet detail with capping system
AH25-8C – rooflight kerb detail
AH25-9C – upstand to cladded abutment detail
AH25-10C – pitched roof abutments detail
AH25-11C – parapet detail with walkway
AH25-12C – parapet detail insulated
AH25-13C – parapet detail uninsulated
AH25-14C – rainwater outlet detail warm roof
AH25-15C – Big Foot detail concrete deck
AH25-16C – vent pipe penetration detail
AH25-17C – abutment to rendered wall detail
AH25-18C – paving slabs on supports concrete deck detail
AH25-19C – abutment to uninsulated brick wall detail
AH25-20C – door threshold detail warm roof – concrete deck
AH25-21C – abutment to insulated brick wall – concrete deck
AH25 warm roof concrete deck standard details – combined


 Warm roof metal deck standard details

AH25-0M – warm roof build-up metal deck detail
AH25-1M – drip edge detail metal deck
AH25-2M – check kerb detail metal deck
AH25-3M – box gutter/change of level detail metal deck
AH25-4M – roof drain detail metal deck
AH25-5M – right angle rainwater outlet detail – metal deck
AH25-6M – drip edge detail mansard junction – metal deck
AH25-7M – parapet detail with capping system – metal deck
AH25-8M – rooflight kerb detail metal deck
AH25-9M – upstand to cladded abutment detail – metal deck
AH25-10M – pitched roof abutments detail – metal deck
AH25-11M – parapet detail with walkway – metal deck
AH25-12M – parapet detail insulated – metal deck
AH25-13M – parapet detail uninsulated – metal deck
AH25-14M – rainwater outlet detail warm roof – metal deck
AH25-15M – Big Foot detail metal deck
AH25-16M – vent pipe penetration detail – metal deck
AH25-17M – abutment to rendered wall detail – metal deck
AH25-18M – paving slabs on supports metal deck detail
AH25-19M – abutment to uninsulated brick wall detail – metal deck
AH25-20M – door threshold detail warm roof – metal deck
AH25-21M – abutment to insulated brick wall – metal deck
AH25 warm roof metal deck standard details – combined

Warm roof timber deck standard details

AH25-0T – warm roof build-up timber deck detail
AH25-1T – drip edge detail timber deck
AH25-2T – check kerb detail timber deck
AH25-3T – box gutter/change of level detail timber deck
AH25-4T – roof drain detail timber deck
AH25-5T – right angle rainwater outlet detail – timber deck
AH25-6T – drip edge detail mansard junction – timber deck
AH25-7T – parapet detail with capping system – timber deck
AH25-8T – rooflight kerb detail timber deck
AH25-9T – upstand to cladded abutment detail – timber deck
AH25-10T – pitched roof abutments detail – timber deck
AH25-11T – parapet detail with walkway – timber deck
AH25-12T – parapet detail insulated – timber deck
AH25-13T – parapet detail uninsulated – timber deck
AH25-14T – rainwater outlet detail warm roof – timber deck
AH25-15T – Big Foot detail timber deck
AH25-16T – vent pipe penetration detail – timber deck
AH25-17T – abutment to rendered wall detail – timber deck
AH25-18T – paving slabs on supports timber deck detail
AH25-19T – abutment to uninsulated brick wall detail – timber deck
AH25-20T – door threshold detail warm roof – timber deck
AH25-21T – abutment to insulated brick wall – timber deck
AH25 warm roof timber deck standard details – combined

Case Studies

Hydrostop AH25 offers fast track solution at Gatwick Diamond “Blue Light” offices case study PDF
Cool customer case study PDF
Sacred Heart Primary School case study PDF
Balcony waterproofing – why use a liquid? case study PDF